Projects
Lockheed Martin - Bldg. 156H West Addition
Sunnyvale, CA
Project Value: $48,000,000

75,000 sf new building addition. The new construction included coordination with an environmental test chamber being constructed by the Owner’s vendor simultaneously. Demolition of an existing parking lot, demolition of existing structures in and around the footprint of the new building, new utilities, a foundation to house the environmental test chamber, structural steel frame for 3 story building, metal siding, new utility infrastructure, and new clean environments.

nVIDIA – Various projects
Santa Clara, CA
Interior improvements, including mechanical and electrical modifications and new finishes.


Lockheed Martin - Bldg. 178 Vehicle Maintenance Facility
Sunnyvale, CA Project Value: $5,800,000
New LEED Silver certified building composed of vehicle maintenance/repair facilities, vehicle wash station, and fueling pumps.

Exodus – New Server Rooms
Project Volume: $3.1 Million
Design and construction of a new 18,000 sq. ft. Server Facility including HVAC design, electrical design, a leak detection system, structural upgrades and modifications, raised access flooring, and roof screen.


Lockheed Martin – Bldg. 201 Demolition
Palo Alto, CA
Project Value: $3,300,000
Prepare existing building for complete demolition and removal, including underground utilities relocation and safe-off of all building services.

Sun Mirco Systems – SCA 23
Santa Clara, CA
Secured Government office area. This project included improvements and electrical & mechanical upgrades with SCIF capability and government approval.


Exodus – New Building HVAC System
Santa Clara, CA
Project Volume: $1.8 Million
The project included new CRAC units and PDUs to upgrade an existing data center.


NASA Ames Research Center
Mountain View, CA
Project Value: $2,450,000
10,000 sq. ft. office space to data center conversion including a Class 1000 clean room facility and remodeling of Executive suites.


Cidco
Morgan Hill, CA
This Design/Build project required demolition of existing office space in Building 220 to prepare for the move of MIS from Building 485.


Seagate
Scotts Valley, CA
Complete build out of a 20,000 sq. ft. data center and 10,000 sq. ft. executive office spaces.